Pumping Stations

Pumping Stations is an area of work in which we specialise in regarding experience and completing the most straightforward job to the most challenging in terms of ground conditions or difficult locations we have completed them all.

Click on the projects image below to see more

 

Little Island Pumping Station

These works were undertaken as part of a scheme by Cork County Council to install 3km of Foul sewer and storm water pipelines together with connection to the main foul pipeline and storm system for domestic customers in the little island area of Cork. Source Civil was appointed as the main contractor and PSCS by Cork County Council.

Clabby Road Pumping Station

 


 

 

 

 

The Clabby Road Pumping Station was constructed in Fivemiletown, Tyrone, Northern Ireland. We at Source Civil Ltd. undertook this project as a Specialist Civil Contractor and were responsible for the installation of the 6m diameter Caisson, sheet piles, concrete piles and also the instalment of the Outflow Pipe in extremely challenging conditions.

Galgorm Pumping Station

Source Civil Ltd was specialist civil contractor and carried out all civil works for the 12.5m dia Caisson Shaft consisting of a Storm Holding tank and Pumping Station and deep inlet pipework on behalf of the Main Contractor for Northern Ireland Water. 

Tory Island GWS - Water Pumping Station

The Tory Island Pumping Station was designed and constructed by Source Civil Ltd. We at Source Civil Ltd.  were responsible for overseeing the Design and Construction of all elements of Pumping Station in this challenging environment.

Ballymurtagh Pumping Station

Constructing a new foul sewer pumping station with duty and stand-by pumps, valve chamber, rising main together with foul sewer rising main discharging to a new foul sewer manhole and then to the existing foul sewer manhole at the northern end of the Shannon Industrial Estate.

Cortober Pumping Station

Cortober Pumping Station was located within a flood plane adjacent to the river Shannon. The ground conditions on this contract were especially challenging with over 7 metres of water logged peat soils. We installed a 9m x 5m x 6m Deep PU20 Sheet Piled Cofferdam with 3 no support wailer frames were used as part of the temporary works arrangement.